Material waste calculator
Turn a net quantity and a waste allowance into the quantity to order, or measure the waste rate a job actually had from delivered and installed.
Optional. Any unit works, as long as every quantity uses the same one.
What the job takes with no waste, from your takeoff.
Your own allowance, from the supplier or from past jobs. The other mode measures it.
Optional. Rounds the order up to whole packs.
Optional. Material sent back or kept for another job is not waste.
Optional. Any currency; results use the same one.
Quantity to order
…
How to use it
- Choose whether you are planning an order or checking a finished job. Type a unit if you want it shown in the results.
- To plan, enter the net quantity, your waste allowance and the pack size. To check, enter what was delivered, what was installed and what went back.
- Add a unit cost to see what the extra or the waste cost, and copy the result.
Two ways to state a waste rate
A waste percentage can be measured against two different bases, and they give different numbers for the same job. Say 110 m² was delivered and 100 m² was installed, so 10 m² was wasted.
As a share of what was delivered it is 10 ÷ 110 = 9.09%. As an allowance on what was installed it is 10 ÷ 100 = 10%. The allowance is the one to use when ordering, because order quantity = net × (1 + allowance): 100 × 1.10 = 110. Adding 9.09% to the next job’s net quantity would leave you short.
| Measure | Formula | Example |
|---|---|---|
| Waste | delivered − installed − returned | 110 − 100 − 0 = 10 |
| Share of delivered | waste ÷ delivered | 10 ÷ 110 = 9.09% |
| Allowance on installed | waste ÷ installed | 10 ÷ 100 = 10% |
| Order quantity | net × (1 + allowance) | 100 × 1.10 = 110 |
Why there is no table of waste percentages here
Waste depends on the material, the layout, the crew, the site and how carefully offcuts are reused. A single list of percentages would hide all of that. The most reliable figure is your own: measure it on finished jobs with the second mode and reuse it for the next order.
Related tools
Questions people ask
How do I calculate the waste percentage?
Waste is delivered minus installed minus anything returned. Divide it by the installed quantity to get the allowance to add to future orders, or by the delivered quantity to get the share of the purchase that was lost.
How do I add waste to a quantity?
Multiply the net quantity by (1 + waste ÷ 100). 120 m² with a 10% allowance is 120 × 1.10 = 132 m², then round up to whole packs.
Is leftover material counted as waste?
Not if it goes back to the supplier or onto another job. Enter it as returned so it is not counted. Offcuts that end up in the skip are waste.
Does this work for any material?
Yes. Tile, timber, plasterboard, rebar, concrete, paint: any material whose quantities are all in the same unit, whether m², pieces, kg or litres.