Daily construction report

Record the weather, who was on site and for how long, equipment, deliveries, the work done, delays, safety and visitors, then download a one or two page PDF or copy it as text.

Report
Weather
Crew on site
Equipment
Materials delivered
Safety
Site photos

Today on site

    The text is kept in this browser so a reload does not lose it. Photos and their captions are not kept; add them just before you export.

    How to use it

    1. Fill in the date, project, report number and your name, then the weather. Tick the box if weather stopped work and enter the hours lost.
    2. Add a row for each crew with the number of people and hours, then the equipment and deliveries. Write the work performed, delays, safety notes and visitors. Add up to six photos with captions.
    3. Download the PDF for the file and signatures, or copy the report as plain text to paste into an email or a WhatsApp group. Sections you leave empty are left out.

    What goes in a daily construction report

    A daily report, also called a site diary or daily log, records one day on site: the weather, the crews and their hours, the equipment, what was delivered, what was built, what held work up, safety events and who visited. Written the same day, it is the record people go back to when a delay, a claim or a payment is questioned weeks later.

    Keep entries factual and specific. "Level 3 slab: rebar fixed on grids A to C" says more than "rebar work". For delays, write the cause, the time lost and who was told.

    How man-hours are counted

    For each crew row the tool multiplies the number of people by the hours each worked, then adds the rows. Six people for 8 hours and four people for 9 hours give 6 × 8 + 4 × 9 = 84 man-hours. If people in the same crew worked different hours, put them on separate rows.

    Man-hours from your daily reports add up to the labour actually spent, which you can set against progress in the project completion calculator.

    Photos and follow-up

    A captioned photo of each area worked is often the quickest proof of progress. Defects you spot on the daily walk can go onto the punch list, and safety findings into the site inspection checklist.

    Questions people ask

    What should a daily construction report include?

    The date and project, weather, crews with headcount and hours, equipment, materials delivered, the work performed, delays and issues, safety incidents and the toolbox talk, visitors and inspections, and photos. This template has a field for each.

    Who writes the daily report?

    Usually the site manager, superintendent or foreman who ran the site that day. The PDF ends with signature lines for the person who prepared it and the site manager.

    How do I calculate man-hours?

    Multiply the people in each crew by the hours each worked and add the results. The tool shows the sum and the worked formula as you type.

    Can I send the report on WhatsApp or by email?

    Yes. Copy as text gives a plain summary to paste into any message. Download the PDF when you need a file with photos and signatures.

    Is my report saved?

    The text is kept in this browser until you start a new report or clear your browser data. Nothing is uploaded. Photos are not kept, so add them just before you export.